Design documents, sequence of operations, and TAB scope reviewed against the mechanical schedule.
Field instruments calibrated and calibration certificates recorded.
Air, hydronic, and specialty systems measured against design values.
Systems adjusted to design; deficiencies flagged to the design team.
Final TAB report issued in the NEBB reporting format.
To scope TAB work, share mechanical drawings, equipment and airflow schedules, design water flow rates, control sequences, project specifications and the commissioning schedule. Include site access constraints and any outstanding performance issues.