Driving Innovation in Manufacturing

Encapsulates our unwavering commitment to pushing the boundaries of what’s possible in the manufacturing industry.

CFD Analysis

Computational fluid dynamics for data center thermal architecture, cleanroom and hospital pressurization, industrial exhaust, and smoke management. Models are used to support design and operational decisions.

ASHRAE 90.4

ASHRAE TC 9.9

NFPA 92

IBC

Positioning

CFD is applied as an engineering decision-support tool — not a visualization exercise. Each model is scoped to a specific design question, bounded by measured or specified boundary conditions, and delivered with a report a design engineer or AHJ can act on.

Capabilities

  • Data center hot-aisle / cold-aisle studies

  • Cleanroom and hospital pressurization studies

  • Kitchen exhaust and ecology unit sizing

  • Smoke management and egress modeling (IBC / NFPA)

  • Industrial process ventilation and heat-load studies

  • External wind, dispersion, and pedestrian comfort analysis

avc

Applicable standards

ASHRAE 90.4

ASHRAE TC 9.9

NFPA 92

IBC

Specific certifications, personnel qualifications, and delivered outcomes for a given project are confirmed on scope of work.

Industries & Applications

Industries served

Data Centers & Colocation

Healthcare & Life Sciences

Semiconductor & Cleanrooms

Industrial & Process

Commercial (Class A)

Methodology

How we deliver CFD Analysis.

Scope definition

Design question, decision criteria, and boundary conditions defined with the project team.

01

Geometry & mesh

3D domain built from drawings or scans; mesh refined against the physics of interest.

02

Boundary condition

Airflows, loads, and setpoints established from mechanical schedules or measurements.

03

Simulation

Steady-state or transient solve; sensitivity runs against critical
variables.

04

Reporting

Engineering report with figures, findings, and design or operational recommendations.

05
Deliverables

What you receive.

Deliverables are packaged in a format acceptable to the design engineer of record, the commissioning authority, and (where applicable) the AHJ.

  • CFD study report with executive summary

  • Annotated thermal, velocity, and pressure fields

  • Design or operational recommendations

  • Sensitivity results against critical variables

  • Model archive for future what-if analysis

Related equipment families

Custom Air Handling Units

Project-specific AHUs configured to submittal.

Data Center Cooling Equipment

CRAH, in-row, and rear-door cooling for data halls.

Methodology

Discuss your CFD project scope.

Share the facility type, design question, drawings, airflow schedules, heat loads, and operating conditions available for the study. Our engineering team will review the scope and identify any further inputs needed.

Email your project RFQ  |  Upload technical documents

Related services