Design fire, tenability criteria, and boundary conditions agreed with the design team and AHJ.
3D model of the affected volume built from architectural and mechanical
drawings.
Smoke transport and pressurization simulated; sensitivity runs against
critical variables.
Results compared against agreed tenability criteria and egress-time targets.
Analysis report packaged for submission to the design engineer of record and the AHJ.
The information below helps define the analysis scope, code path, assumptions, modeling requirements and submission responsibilities.
Architectural and mechanical drawings (PDF or CAD)
Life-safety narrative and code path (prescriptive vs. performance-based)
AHJ contact and any pre-application feedback
Design fire assumptions (if pre-established)
Occupancy and egress design data
Share architectural and mechanical drawings, the life-safety narrative, occupancy and egress information, proposed smoke-control sequences and any authority feedback. Identify the design question and the criteria already established by the project team.
Email your project brief or upload technical documents. The analysis scope, assumptions, required professional roles and submission responsibilities are agreed for the project.