Pumps & Pumping Packages

Hydronic pumping packages and skids.

Overview

Hydronic pumping packages configured against project flow, head, and redundancy requirements. Skid, controls, and variable-speed strategy selected per the project’s mechanical narrative.

Technical selection

Pumping packages are scoped to the plant’s design point and control strategy — with skid, VFDs, and controls delivered as a single coordinated package rather than loose components.

Scope of SANA USA support

  • Pump curve selection against project design point
  • Skid, controls, and VFD configuration
  • Applicable US listings confirmed per selection
  • Submittals and start-up coordination

Cut sheets, performance curves, BIM models, and technical documentation are provided against a specific selection once the project scope is defined.

Information for technical selection

Share design flow and head, fluid type and temperature, suction conditions, operating profile, redundancy, electrical supply and the proposed control sequence. Include piping diagrams, installation dimensions and any skid or material requirements.

Email your equipment RFQ or upload your equipment schedule. For cut sheets, performance data, drawings or certificates, request the documents needed for your proposed selection; availability and applicable product/model compliance are confirmed for that selection.

Category:

Description

Configuration structure

Configured against your project — not preselected.

Available manufacturers and model selections are confirmed after SANA USA reviews the project requirements and prepares the project-specific technical selection.

Pump type
Redundancy
Package format
Drive & control
Technical specifications

Published against a specific selection.

Design flow, head, efficiency, NPSH, motor and VFD data, materials, dimensions, electrical requirements and controls interfaces are issued with the selected pumping package.
Applicable Standards, Certifications & Test Requirements​

Applicable standards, certifications, and test requirements vary by product and project. Final requirements are confirmed as part of the equipment selection and project submittal.

Additional information

Applications

Commercial · Industrial · District Systems

Manufacturer / Model / Capacity

Confirmed against each project's mechanical schedule and requirements. Not published on the site prior to selection.

Industries

Commercial (Class A) · Industrial · District Energy