Illustrative technical example; not a completed SANA USA project or verified client engagement.
Facility profile: Colocation data hall
CFD Analysis
Thermal Design Review
US project
CFD + review
CFD report
Rack-resolved
Owner needed independent CFD validation of the containment strategy for a new data hall before energizing IT load, including verification of rack-level supply temperatures against the design intent.
Built a full CFD model of the hall against the mechanical schedule and containment layout, ran sensitivity analyses on redundancy scenarios, and issued an engineering report the design engineer of record and commissioning authority could act on.
Identified containment leakage and stranded-capacity issues before energization and provided prioritized remediation options — all findings documented in a signed engineering report.