Illustrative technical example; not a completed SANA USA project or verified client engagement.
Facility profile: Class A office portfolio
Equipment Selection
Submittal Coordination
US project
Neutral selection
US submittals
Project-specific
Owner wanted an engineering-led, manufacturer-neutral selection for a chiller plant retrofit — matched to the plant’s load profile, redundancy tier, and refrigerant policy.
Ran a neutral selection exercise against multiple qualified manufacturers, developed the pumping and controls scope, and coordinated the US submittal and warranty package.
Delivered a selection defensible to the design engineer of record, with US-format submittals and a warranty framework confirmed in the signed proposal.