Driving Innovation in Manufacturing

Encapsulates our unwavering commitment to pushing the boundaries of what’s possible in the manufacturing industry.

Case Study · Commercial / Class A · United States · Representative

Hot-aisle / cold-aisle CFD validation for a colocation data hall

Representative scenario

Illustrative technical example; not a completed SANA USA project or verified client engagement.

Facility profile: Colocation data hall

CFD Analysis

Thermal Design Review

factory-scale-BmifVqdd

Representative

US project

Scope

CFD + review

Typical deliverable

CFD report

Detail level

Rack-resolved

Typical Challenge

Owner needed independent CFD validation of the containment strategy for a new data hall before energizing IT load, including verification of rack-level supply temperatures against the design intent.

 
Typical Engineering Approach

Built a full CFD model of the hall against the mechanical schedule and containment layout, ran sensitivity analyses on redundancy scenarios, and issued an engineering report the design engineer of record and commissioning authority could act on.

 
Typical Deliverable / Potential Outcome

Identified containment leakage and stranded-capacity issues before energization and provided prioritized remediation options — all findings documented in a signed engineering report.

 

Have a similar project?